Day 5: nothing but ill. Day 6: great.
We finished all the mounting pieces and found a place inside mataderos where we can set up the installation and leave it there untouched until the end of the workshop. The only minus-point of the day: all the cameras have 2b rewired, electronics don’t work as easy as we thought: It’s not possible to just wire all the release-switches parallel – every one has to have it’s own opto-isolator plus pull-down resistor attached to it. Karolina is actually going crazy resoldering all the switches, cameras, resistors and opto-isolators…
pictures of the day:
0 Responses to “Immodesty, Day 5&6”